TAKE A LOOK AT OUR PRODUCTS
-
Stairs Miami
Elevate your home's interior with the stunning Stairs Miami. Crafted with precision and elegance, our stair treads are made from solid wood, ensuring both durability and timeless beauty. Each step is designed to add a touch of sophistication to your home, making every ascent and descent a graceful experience.Get latest price -
Standoff Railing
Get latest price -
Spigot Railing
Get latest price
Key attributes
Product Parameters
Item Name | Realgres Product |
Materials | Best Non Slip Stair Tread,Elegant Standoff Railing |
Size | Custom |
Application | Hotel, Commercial/Residential |
Design Style | Contemporary/Modern |
product detail
For the solid wood treads, you have a diverse palette of choices.
Beech, Ash, Oak, and Walnut offer a natural and warm feel, while Sapele and Leak add a touch of exotic elegance.
Each of these woods boasts its own unique grain patterns and hues, ensuring that your floating stair will be a one-of-a-kind creation.
And when it comes to the railing, the options are just as captivating.
Clear glass offers a seamless and transparent look, allowing you to enjoy unobstructed views.
Ultra glass, on the other hand, provides extra durability and scratch resistance, ensuring that your railing remains pristine for years to come.
Colored glass adds a vibrant and contemporary touch, while ground glass offers a more subtle and diffused effect.
REALGRES STAIR FACTORY
Staircase production process
1、 After receiving the deposit, we will complete the shop drawing design within 5-7 working days and send it to you for review.
2. After you confirm that the shop drawings are corect and sign to confirm the drawings, we will proceed with production based on the drawingsthe production time is approximately 20-25 working days.
3. Then we will arrange the stair assembly and testing at the factory, and send you pictures and videos of the assembled stairs.
The assembly time for each set of stairs is approximately 2-3 working days.
4. After you inspect the stairs through videos and pictures and confirm that they are corect we can arange material for surface treatment and color
which will take approximately 5-7 working days.
5. finally, after we receive the balance payment, the goods can be arranged for shipment.